Skip to Content

Lane Restrictions Tuesday at Green River Bridge on the Audubon Parkway

Henderson, KY, USA / WSON AM & FM
Lane Restrictions Tuesday at Green River Bridge on the Audubon Parkway


MADISONVILLE, Ky. (July 23, 2024) – The westbound Audubon Parkway will be restricted to one lane between the 15.6 and 15.9 mile points near the Green River Bridge in Daviess County Tuesday as crew work to repair an issue on the shoulder of the road.

Erosion was found along the right shoulder of the roadway near the bridge, which will require the parkway to be restricted to one lane from approximately 8:30 a.m. to 2 p.m. Tuesday. The right lane and right shoulder of the roadway will be blocked for the duration at this point.

This work is in addition to previous scheduled work already scheduled at two other locations on the Audubon Parkway Tuesday in Henderson County. Both of this also include lane restrictions at the 1.8 mm on the westbound side and at the 2.5 mm on the eastbound side. These two project are estimated to be completed on Wednesday.

Some delays are possible during the movement and placement of equipment to facilitate the work.

Appropriate caution is required where equipment, flaggers, and personnel are along the roadway in close proximity to traffic flow.

Comments

Leave a Reply